Welcome

If you have an account and wish to login, please use the account login adjacent.

To be able to login you must have created an account.

Create an account

Create 

Account Login

Forgot your login details? Click here

 
Cancel search
 
 
Go to Lot #  

Lot 2 - Mori Seiki NH8000 5 axis Horizontal Machining Centre (2006)

Description:

Traverses XYZ: 1400 x 1200 x 1350 mm

Pallet dimensions 800 x 800mm

Full B Axis

15,000 rpm

Through Spindle Coolant 

15k BT50 Spindle

Twin Pallet

230 Tool carousel

FANUC Control MSX-711

Filtermist Unit

Drum Filtration Conveyor

HP through tool coolant.

At least one probe will be included as well as approximately 200 various BT50 back-ends.

* MUST BE REMOVED BY 19TH MARCH 2018

* Please note payment will need to be made within 24 hours of the auction ending

Export Information

Please note: If you are successful in purchasing an item and wish to export it from the UK, a charge of £75.00 will be automatically added to your invoice to cover preparation of the goods and completion of the required UK export customs declarations. This process has been a mandatory UK export requirement since 1 January 2021.

All invoices are issued on an Incoterms FCA basis.

Exports outside the EU may require an export licence. Where applicable, a further charge of £250.00 will be automatically added to your invoice. Please also note that, while an export licence is being processed, the purchaser is responsible for placing into storage until the licence is issued.

* Please note all dimensions stated are approximate, however the accuracy cannot be guaranteed and should be verified by the bidder before bidding.

Bid information

Time remaining

HRSMINSEC
000000

09 Mar 2018 15:20:00 GMT

 
Final remove by date: 19/Mar/2018

Location: Northamptonshire

Lot location

Transport information

  • Other Transport Details: Cost to skate & load to transport - £5,000 +VAT Cost for an engineer to decommission, drain coolant , fit transit brackets etc - £6,466+ VAT * Please note these costs are based on three engineers over four days and a transport company based on site for 3 days. - Please note this will be automatically added to your invoice
 
 
Go to Lot #